FILLING OF OPEN WELLS
SCOPE:-
This work consists of
Ø
Removal
and disposal of all unsuitable and obstructing material.
Ø
Demolition
of well lining, placing of selected material in layers and compaction of the
same.
This
methodology is applicable for open wells with size < 6m dia over which road
embankment would be built.
DEFINITIONS :
abbreviations:
MoRTH : Ministry
of Road Transport & Highways
M.D.D. : Maximum Dry Density.
O.M.C. : Optimum
Moisture Content.
BOQ
: Bill
of quantities
CROSS REFERENCES :
1) MoRTH – Specifications for Road and
Bridge Works ( Fourth Revision )
2) Technical Specifications
CLASSIFICATION OF WELLS:-
The open wells will be classified as
(a) Lined
(b) Unlined
The casing / Lining of wells may be of masonry, burnt clay, concrete rings or any other type.
MATERIALS:-
Ø
The
fill material shall be non-compressible
type and free from any hazardous material/sewage.
Ø
The
fill material is as given in the table.
Ø
The size of coarse material in soil not exceeds
25mm and incase of sand and gravel mixture, the maximum size not more than
75mm.
Ø
The selected material (Soil and sand-gravel
mixtures) shall have MDD as per IS:2720,part 8)not less than 16.0kN/m3
.The Sand-Gravel mix shall be as per sub clause 2504 .
SlNo |
Description
|
Material Type
|
1 |
Well
with standing Water |
Ø
Mixture
of Sand And Gravel(80:20) up to 1.5m height below natural ground level. Ø
The
Selected granular soil with plasticity Index (PI) <6 for the remaining
depth of well. Ø
To
achieve desired compaction the top 1.5m shall be executed by lowering the
standing water level by more than 1.5m below natural ground level. |
2 |
Dry Well
with Depth |
Ø Mixture
of sand and gravel up to 1.5m height below natural ground level. Ø The
selected granular soil with plasticity Index (PI) < 6for the remaining
depth of well. |
3 |
Well size
less than 1m diameter |
Ø Mixture of natural sand and gravel
|
Ø
All
the debris such as pump, metal wires, rods, etc., and floating material will be
removed.
Ø
In
case of lined wells the lining shall be dismantled up to the level of natural
ground level or one meter in height
whichever is higher.
Ø
Upper
1m of well casing /lining shall be removed when the fill material within 1m of
the existing ground surface.
Ø
Stagnated
water shall be treated by adding Chlorine bleach @ 5lit /2500 liters of
standing water.
Ø
Inspection
of the well after the above steps are completed shall be done before filling
operation.
Ø
The
placing and compaction of operation will be done as per Clause A-10,4d(I to v)
Ø
The
layer so compacted is inspected to carryout next layer for placing and
compaction.
Ø The details of construction operation is explained in the Flow Chart attached.