METHODOLOGY FOR ROAD
MARKING
103
1.
Scope:
� The work shall
consist of marking traffic stripes using a thermoplastic compound meeting the
requirements as shown in Drawings.
2. References:
� MoRT & H
specifications clause no 803 and Technical specifications of contract.
3. Equipments:
� Thermo plastic
material heating Equipment, Road marking machine, Total station.
4. Tools:
� Measuring steel
tape, line rope.
5. Responsibility:
� Responsibility of
Implementation of this procedure lies with Site engineer and in charge of Road
section.
6.
Materials:
~ Thermo plastic material as per clause
No: 803.4.2, Glass reflectorizing beads Type 2 as per Clause No: 803.4.3.
7.
Procedure:
� The traffic will be diverted by
placing proper safety barricades/safety cones/flag man.
~ Median and shoulder work shall be
completed prior to Road marking.
~ The BC surface shall be thoroughly
cleaned of all dust, dirt, grease, oil and all other foreign matter before
application of paint.
·
The thermoplastic powder is put in to the container of
machine and it is to be heated. The material is mixed uniformly by operating
the mechanical agitator in the container. The thermostat is adjusted to a temp of
180-2000C. The material is added to the container to its full
capacity and melted till it achieves smooth consistency.
104
· Thermoplastic materials shall be applied in hot condition
either by screeding or extrusion process.
·
After transferring the thermoplastic paint to the laying
apparatus, the material shall be laid at a temperature within the range of 180
to 200 degree centigrade.
· The application
properties of the thermoplastic material shall be such
that it shall readily get
screeded or extruded at applied temperature.
·
The paint shall be applied with a thickness of 2.5 mm
exclusive of
surface glass
beads. The width shall be as per drawing.
· The Glass beads
shall be applied at the rate of 250 grams per square meter area.
·
The finished lines shall be free from ruggedness on sides
and ends. The
upper surface of
the lines shall be level, uniform and free from streaks.
·
Traffic shall be allowed after 60 minutes of application
at specified
temperature.
8. Safety
Requirements:
� Wherever the road
marking is under process the area shall be properly barricated.
� The pavement
temperature shall not be less than 100C during application.
� The thermoplastic
material shall not be maintained in a molten condition for more than 4 hours.
�
All workmen shall be screened and trained.
� All workmen at
work area shall wear PPE·s
and reflective jackets.
� During night work
sufficient lighting shall be provided.